What Are Specifications in Construction?

by olivia benson  ·

Nov 19, 2026

Specifications in construction are the written details that say exactly what goes into your home: the brand, model, size, color and finish of each product, often called specs for short.

At Mix & Mesh, I think of specifications as the bridge between the home you’re picturing and what actually gets ordered, because your builder can only order what’s written down.

This happens in Design It, the stage of the Season Method where you make every selection before construction starts.

At a Glance

  • Season: Design It (when you make your selections, before construction starts)
  • Who’s involved: you, your builder, your designer or architect if you have one, and the trades who install each item
  • Where it shows up: the standard specs in your contract, your selection sheets, and on custom homes, a spec book from your architect or designer

In this post

Why Specifications Matter for Your Build

Being general gets you general items. If you’re looking for something specific, you need to list it out in detail, because if it isn’t written down, it’s an assumption, and assumptions can turn into change orders.

I see this often with subway tile in bathrooms. Someone writes down the brand and the color and just lists it as “subway,” but that brand makes subway tile in more than one size, like a 1 x 2 ratio and a longer 1 x 4.

Then someone makes a reasonable judgment call instead of checking, and now a tile you didn’t have in mind is going on your walls.

How Specifications Work

When you sign, your contract includes the builder’s standard specs, the products already in your price. As you make each selection, it gets written up with everything someone needs to order it without asking you again. Your builder uses those details to confirm the price and lead time, place the order, and tell each trade what to install.

Paint is a good example. It’s one of the few selections I recommend choosing last. Even then, it’s better to tell your builder now that you want Benjamin Moore than to leave it open or hand them a color to match.

A named brand is more accurate, and it affects the price, since Benjamin Moore often costs more than brands like Behr or Valspar.

The sheen (how shiny it dries) matters just as much. If you only say “white,” the painter may use satin on the walls, and it turns out shinier than you pictured. If your spec says eggshell and the walls get satin, you have something to point to, and whoever made the error fixes it without charging you.

The layout belongs in your spec, too. I usually write “refer to drawings” for patterns and layout, but if your drawings don’t show it, this is your time to write it down. Otherwise your installer might assume a subway pattern (each row offset by half a tile) when you actually wanted a straight set, with the tiles lined up in a grid.

Types of Specifications

Standard specs. Also called the build package, these are the products already included in your price, like the builder’s standard faucet or interior door. Anything you choose instead is an upgrade or a pick against an allowance.

Selection specs. Your own choices, organized by room or by category, with full product details. This is the version homeowners create, and it doesn’t need to be a spreadsheet.

Project specifications. On custom homes, an architect or designer often writes a spec book that covers the materials and how they should be installed. Your builder prices the job from it alongside the drawings.

What Specifications Look Like on Paper

Here’s what a few lines of a selection spec might look like for one bathroom. The code groups items by category (PL for plumbing, TL for tile, PT for paint), and the room column tells every trade where each item goes.

CodeRoomItemBrand and SKUColor and finishQtyNotes
PL01Primary bathVanity faucetBrand A, 4410-MB-8Matte black28-inch widespread, drain included
TL01Primary bathShower wall tile, 2 x 8Brand B, 2080-WH-28White, glossBuilder to calculateStraight set, horizontal, see drawings for layout
PT01Primary bathWall paintBrand C, Warm White 0123EggshellBuilder to calculateWalls only, ceiling is PT02
Sample for illustration only.

Questions to Ask Your Builder

  • Can I see your standard specs with brand and model numbers?
  • What details do you need from me for each selection?
  • Who writes up my final specs, and when do I sign off on them?
  • Where will the final specs live, so every trade works from the same version?

Common Specification Mistakes

  • Writing down the look but not the full SKU. A SKU often has a few letters added at the end for the finish, and sometimes more for the size. List the brand, color, finish and everything else on the product page. It’s better for your builder to have all of it than to assume you’re on the same page.
  • Leaving out the visible pieces that go with a selection, like the drain for a sink. You don’t need to spec what’s inside the wall, though. With plumbing, your plumber usually works out the rough-in (the pipes and valves inside the wall) and the parts that go with it. Do your due diligence on what you can see, and lean on your experts for the rest.
  • Changing a selection without updating the spec and telling your builder, especially mid-build. Once something is bid and the labor is set, even a change at the same price point, like a new tile pattern, can change the labor cost and the schedule. The installer may not be set up for the new product, either.

Olivia’s Tip

Leave material quantities to your builder. List quantities for selections, like two faucets and one toilet, but leave them blank for materials like tile and flooring. The amount needed depends on the floor plan, waste, and the installer’s skill and tools, so calculating it is the estimator’s job, not yours.

Specifications vs. Drawings

Drawings show where things go and how big they are. Specifications say what each thing is and the quality it needs to be. Ideally the two match: if your drawings show two sinks, your spec lists two faucets.

Your contract, your drawings and the specs you sign off on are all part of your agreement, so they need to agree with each other. When they don’t, many contracts set an order for which one rules, often the contract first, then the drawings, then the specifications.

Either way, ask your builder how they handle a mismatch. I like to be told when something is off, usually through an RFI (a request for information), so it gets sorted out before anything is built.

Frequently Asked Questions

Do I need a designer to write my specifications?

No, but if you write your own, do it carefully. Ask the showroom or supplier for each product’s spec sheet, which you can often find on the manufacturer’s website too. Download the warranty and installation sheets as well, if the product has them.

The spec sheet already lists everything the trade needs, so you can hand it off instead of retyping it. Every time a SKU gets re-entered, there’s another chance to mistype a number or a letter.

What does “or equal” mean on a spec?

It means a different product of equal quality can be used in place of the one listed. Ask who decides what counts as equal, and whether you’ll see the substitute before it’s ordered.

Build Your Room-by-Room Selections walks you through a homeowner version of a selection spec. It isn’t an architect’s spec book, but it records everything your builder needs, in a visual format instead of a spreadsheet. It comes with The Home Insider, where I answer every question personally on Tuesdays and Fridays. It’s a monthly membership, and you can cancel anytime.

Guides That Use This Term

Post your progress or finished room in House Plans and Build Costs, my free community of over 60,000 homeowners and pros. Your home could be featured in a future guide.

Originally published November 19, 2026.